By manufacturing our panels, joists and trusses off-site, we eliminate the need for timely rework or adjustments. Your team receives components that fit together flawlessly the first time.
We strictly adhere to the STA Site Safe Strategy. Pre-assembled components naturally reduce material handling, minimise working at height and improve overall site traffic management.
We understand the importance of programme sequencing. We coordinate our transport logistics directly with your site managers to ensure deliveries arrive exactly when you are ready for them.
We supply your team with detailed structural drawings, foundation tolerances and exact scaffolding requirements well before our assembly teams arrive on site.
We load and dispatch our timber components in a sequenced order, ensuring the right materials are easily accessible for immediate lifting and installation.
Our certified installation teams erect the timber frame safely and efficiently. We provide strict quality assurance checks before a formal handover to your follow-on trades.
The main contractor is generally responsible for supplying and erecting the scaffolding. We will provide you with all the necessary loading requirements and working platform heights in advance.
Yes. We highly recommend our Easi-Joist metal web system. The open web design allows follow-on trades to run pipes and cables freely without drilling through solid timber.
Because timber frames are made watertight very quickly, electricians and plumbers can usually begin their first fix work on the inside while external cladding or brickwork is still being completed outside.